Open for Investment 🏗️ Superstructure & Roofing (65% Complete) 🛡️ Risk: Medium

Sunset Estate Phase 2

Plot 410-418, Kuje Innovation Corridor, Sector Centre B, Abuja FCT (FCT State) • Developer: Primecrest Properties & Infrastructure Ltd

1. Overview & Investment Thesis

Sunset Estate Phase 2 is a premium residential development in the fast-growing Kuje district of Abuja. The project consists of 48 units of 3-bedroom terrace houses and 24 units of luxury 4-bedroom detached duplexes. Investors will earn projected returns through property appreciation and rental income upon completion.

Key Project Highlights

⭐ Prime FCT location
⭐ Growing infrastructure
⭐ Dual income streams
⭐ Registered C of O
🏢
Primecrest Properties & Infrastructure Ltd
✓ Verified Institutional Developer Partner

Over 14 years of premier residential execution across the FCT. Successfully completed 8 estate developments delivering 720+ residential homes with zero bond defaults.

📍 Headquarters: FCT, Nigeria
🏛️ Trustee Custody: First Custodian Trustees Ltd (SEC Registered)

📍 Location & Growth Corridor

Address: Plot 410-418, Kuje Innovation Corridor, Sector Centre B, Abuja FCT

Coordinates: 8.8920, 7.2280 Zoning: Residential R-2 (Approved Medium-Density) Regional Growth Rate: +14.5% p.a. capital appreciation

2. Financial Information & Returns

Minimum Investment
₦100,000
Low entry threshold
Target Capitalization
₦50,000,000
Total project equity
Amount Raised
₦33,000,000
66% funded to date
Projected Return (ROI)
18.0% p.a.
Annualized yield
Investment Tenor
18 Months
Contract maturity window
Payout Frequency
Quarterly
Next: November 30, 2026
💳 Distribution Policy & Automated Wallet Payouts

Yield dividends are accrued on a daily basis from capital deployment and disbursed quarterly directly into each verified investor's AGS digital wallet. Payouts are subject to standard 10% Nigerian withholding tax. Full principal capital is reimbursed upon 18-month project exit.

⚡ Direct AGS Wallet Automation 📅 Frequency: Quarterly Rental Yield + Capital Return at Maturity 🔒 Segregated Escrow Account

🧮 Interactive Return Calculator

₦
Minimum required: ₦100,000
Projected Annual Profit
₦--
Total Payout at Maturity
₦--
Monthly Equiv. Yield
₦--

3. Project Information & Development Plans

Architectural Style
Contemporary Tropical Minimalist
Total Units
48 Terrace Homes & 24 Detached Duplexes
Total Site Area
32,500 sqm (3.25 Hectares)
Zoning Classification
Residential R-2 (Approved Medium-Density)
Structural System
Reinforced Cast-in-Place Concrete Skeleton
Power Infrastructure
Dedicated 500kVA Step-Down Transformer + 100kW Hybrid Solar Microgrid
Water & Drainage
Industrial Deep Borehole with Central Reverse-Osmosis Treatment & Underground Storm Drainage
Internal Road Network
Interlocking Paved Driveways (9m width) with Solar Streetlamps
Overall Project Construction Progress Superstructure & Roofing (65% Complete)

4. Milestone Timeline

Funds from investors are held in custody and disbursed strictly against certified engineering completion milestones.

Phase 1: Land Acquisition & Title Perfection Completed ✓
Target Date: Q1 2025  •  Site acquired, perimeter surveyed, FCT Certificate of Occupancy registered.
Phase 2: Architectural & Statutory Approvals Completed ✓
Target Date: Q2 2025  •  Building plans sanctioned by FCDA Development Control and EIA clearance issued.
Phase 3: Substructure & Foundation Pour Completed ✓
Target Date: Q3 2025  •  Earthworks, deep pile foundations, and ground beam casting completed across all blocks.
Phase 4: Superstructure & Roofing In Progress ⏳
Target Date: Q4 2025 – Q2 2026  •  Framing, blockwork, concrete slabs, and aluminium standing-seam roofing 65% done.
Phase 5: MEP & Interior Architectural Fit-Out Upcoming 📅
Target Date: Q3 2026  •  Electrical conduits, smart home cabling, plumbing, sanitary fixtures, and premium tiling.
Phase 6: Commissioning & Liquidity Exit Upcoming 📅
Target Date: Q1 2027  •  Handover to off-takers, commercial leasing launch, and return of investor capital.

5. Legal Documents & Disclosures

Download and review official offering documents, building permits, registered titles, and due diligence audits.

📑
Comprehensive Investment Memorandum (IM)
PDF • 3.8 MB
Download ⬇
⚖️
Subscription Terms & Investor Legal Covenant
PDF • 1.4 MB
Download ⬇
🏛️
FCDA Approved Building Plan & Development Permit
PDF • 2.1 MB
Download ⬇
📜
Registered Certificate of Occupancy (C of O)
PDF • 1.9 MB
Download ⬇
🌿
Environmental & Social Impact Assessment (EIA)
PDF • 1.2 MB
Download ⬇

6. Risk Disclosures & Mitigation Strategy

Every real estate crowdfunding investment involves specific project risks. Review our formal mitigation safeguards below:

Risk Category Severity Level Mitigation & Protective Safeguards
Construction & Timeline Risk Medium Risk Contracted under a guaranteed maximum price (GMP) EPC agreement with penalty clauses for developer delays.
Off-taker & Demand Risk Low Risk 40% of residential units pre-sold via guaranteed institutional off-take agreements prior to public crowdfunding.
Asset Custody & Titling Low Risk First Custodian Trustees Ltd holds a first legal equitable mortgage over the land title in trust for AGS investors.
Inflation & Material Escalation Medium Risk 75% of essential building materials (steel, cement, aggregate) were bulk pre-purchased and warehoused at foundation stage.
⚠️
Statutory Risk Disclaimer: Investment returns are projected and not guaranteed. Past performance is not indicative of future results. Please read the full risk disclosure before investing.